Rogue Fusion
Services
Sign in
HDPE pipeline installation

Every joint, traceable.
Every hour, accounted for.

Rogue Fusion Services installs high-density polyethylene pipeline and documents it as it goes: joint number, heat number, machine serial, operator qualification and fusion parameters, recorded at the machine rather than reconstructed at closeout. The same record drives crew time, progress billing and the turnover package.

This is the field application — for the crew, the office and the client rep on a job. Looking for the company itself? roguefusionservices.com.

Open the field app

Joint log

Joint numbers, stationing in 0+00, heat numbers on both sides, machine and operator frozen onto the record at the moment it is filed. Correcting a machine record later cannot rewrite what a signed joint says.

Qualifications that expire

A joint recorded against a lapsed operator qualification, or a machine past its calibration date, appears on the open-items list the moment it happens rather than the week an inspector asks.

Safety, on the record

Job safety analyses with their steps and crew sign-on, toolbox talks, incidents and near misses, and pre-use equipment inspections. Joints fused on a day with no JSA on file show up on the open-items list on their own.

Blank forms that match

Eight sheets print from the same layout the filed record uses, so a blank cannot drift from the real form. Fill one in at the machine, enter it when there is signal, photograph the paper and attach it.

The line on a map

Import the alignment as KML or KMZ — read in the browser, nothing uploaded — and the joints place themselves along it by station. Photographs land where they were taken, from the coordinates the camera recorded.

Files on every screen

Scanned forms, certificates, photographs. Nothing is deleted; a file is voided with a reason and stays. A photograph brings its own date and location with it.

Crew time

Weekly timesheets split by job and cost code, submitted and approved in the app. A day booked twice to the same job is refused by the database, not by a reminder.

Progress billing

Installed quantity against contract pay items, earned value, and progress invoices whose lines are stored rather than recomputed. What was billed stays what was billed.

Pressure testing

Hydrostatic tests per ASTM F2164, with the initial expansion phase recorded apart from the hold, and readings that cannot be edited after the fact.

Turnover

Packages scoped to a run or a station range, with readiness computed from the rest of the database: missing certs, unaccepted joints, open punch items, failing tests.

ASTM F2620Butt fusion parameters recorded as the standard names them
ASTM F2164Hydrostatic testing, expansion phase recorded apart from the hold
0+00Stationing per run, refused rather than coerced when unreadable
38 tablesEvery one under row-level security, decided by the database